Las Vegas, June 4 / PRNewswire-FirstCall / - The board of Patriot Gold Corp. (OTC Bulletin Board: PGOL) has approved additional drilling program on the Moss Mine Project located in northwestern Arizona near the City of stupid. After considering both the initial drilling and metallurgical results from the project (see previous press release), the board has authorized a plan of exploration drilling fund more potential to increase resources in depth. Additional metallurgical test the proposed drilling will help determine minability of deposit. New resource calculation will be done once after drilling is completed.
A program of six or seven core holes planned to test the down dip extension of the vein system Moss. Total length of drilling is planned to 3000 feet. Drilling that will test about 2,000 feet long that attack blood vessel and is expected to take six to eight months to complete.
After all of the core is logged, and one-quarter of the core is assayed, the remaining three-quarter will be sent to the core column leach testing. A leach cycle length will be used to determine if the gold / silver recoveries continue to increase beyond 109 days before the test is done. Metallurgy A company will choose to do in the future.
Moss project, located in the Oatman District has a history of production of 2 million ounces of gold. Moss vein system that can be on the surface of the execution for more than a mile. Dipping 40-60 degrees to the south of the area, the calcite-quartz veins and stockworks being drilled as a bulk minable gold target by Patriot. More on Patriot's project and previous press releases can be found on the company's website, http://www.patriotgoldcorp.com.
No comments:
Post a Comment